PLC inc.
Menu

Goldcorp - Eleonore project

Galloway

Galloway

Start-up: 2012

This Galloway is used to dig the shaft of the mine. Kind of like a giant elevator that can carry equipment and men. We are the only workshop to be able to assemble such a mega structure inside. This structure was then dismantled and transported by 19 truck-trailers to the site of the mine by ice roads (yes, like on TV).